360 YIELD CENTER 360 Y-DROP Montaj Talimatları Kılavuzu - Sayfa 8
Çiftlik Ekipmanları 360 YIELD CENTER 360 Y-DROP için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. 360 YIELD CENTER 360 Y-DROP 17 sayfaları. Case 80'/90' boom
10.
On both the left and right boom wings, assemble four (4) 5' boom
sections with 8" connector bars using provided hardware. Another
5' boom section will need to be field cut in half to extend the length
needed for all 24Rx30" or 36Rx20" drops. Assemble this shorter
section to the inner part of both boom folds. In total, the 360 Y-
DROP boom should span 22-1/2 feet, example shown in FIG 7. The
center section will take (2.5) 5' boom sections. Cap the ends of boom
sections with rubber cap.
1.
5' Boom Section
2.
8" connector bar
3.
3/8" x 1-3/4" stainless steel flange bolt
4.
3/8" flat washer
5.
3/8" lock washer
6.
3/8" nut
7.
1-1/4" square rubber cap
FIG
5
FIG
7