Miller Subarc DC 1000 Kullanıcı El Kitabı - Sayfa 29

Taşınabilir Jeneratör Miller Subarc DC 1000 için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Miller Subarc DC 1000 48 sayfaları.

Miller Subarc DC 1000 Kullanıcı El Kitabı
3-7. Using Non-Parallel AC Arcs With A 605 Phase Shift - Terminal Strip TE4 Connections
NOTE
Tools Needed:
60° Phase Shift
Waveform 1
Waveform 2
.
Use two-conductor (12 to 20 gauge), with uninsulated ground,
shielded cable to make TE4 connections. Connect ground to
terminal C on TE4.
2
Connections from first to second
welding power source:
terminal A to terminal E,
terminal B to terminal D,
terminal C to terminal C
A
B
C
D
E
TE4 on first welding
power source
Terminal Strip TE4 Connections For Running Multiple, Non-Parallel AC Arcs With A 605 Phase Shift
When using the 605 ac arc phase shift feature, be sure to follow Section 3-7 and
Section 3-8 to set up the welding power sources properly.
Y If there are any questions regarding this procedure,
contact the factory before connecting units.
AC Waveforms With 605 Phase Shift
3/8 in
(10 mm)
Connections from second to third
welding power source:
terminal A to terminal E,
terminal B to terminal D,
terminal C to terminal C
A
B
C
D
E
TE4 on second welding
power source
1
A
A
B
B
C
C
D
D
E
E
1
3
Connections from third to fourth
A
B
C
D
E
TE4 on third welding
power source
Y Turn Off welding power
source and disconnect input
power before opening ac-
cess door.
Y All units with phase-shifted
outputs must be set up for ac
output according to Section
2-9. Do not parallel dc output
units with ac output units.
Y DC output units do not re-
quire synchronization with
AC output units.
1
Terminal Strip TE4
This procedure allows the ac output
waveforms of two or more units to
have a 60° phase shift. To use
phase shift, make connections be-
tween terminal strip TE4 on appli-
cable ac output units as shown in il-
lustration.
.
Do not disturb factory connec-
tions to terminal strip TE4.
Y Ensure that primary input
power conductors are con-
nected to each unit in the
same sequence (L1 to L1, L2
to L2, and L3 to L3). See Sec-
tion 2-15 for information on
connecting input power. See
Section 2-16 for information
on testing for proper primary
phase sequence.
2
Lead Being Connected To
TE4
3
Securing Screw
Strip 3/8 in (10 mm) insulation off
end of lead, insert end into proper
location on TE4, and tighten appli-
cable securing screw.
Close and secure access door.
.
Connect phase shift plug as
shown in Section 3-8.
welding power source:
terminal A to terminal E,
terminal B to terminal D,
terminal C to terminal C
Repeat same connection sequence
on following welding power sources
Ref. 801 882-A
OM-2221 Page 25