Olympus BH2-CH Substage Montaj - Sayfa 24

Mikroskop Olympus BH2-CH Substage için çevrimiçi göz atın veya pdf Montaj indirin. Olympus BH2-CH Substage 26 sayfaları.

Olympus BH2-CH Substage Montaj
Use a 2.5mm Allen wrench or driver to reinstall three
M3x6 hex socket-head cap screws to secure the left-
hand dovetail block onto the main housing (see
100).
Figure 100 – Reinstall screws to secure left dovetail block
Apply a light coating of grease onto the inside beveled
bearing surfaces of the two dovetail blocks and onto the
two flat bearing surfaces of the main housing (see
Figure
101).
Figure 101 – Grease the bearing surfaces for the slide

Reinstall the Condenser-Slide Assembly

Apply a light coating of grease onto the flat bearing
surfaces of the dovetail slide (see
Figure 102 – Grease flat bearing surfaces of dovetail slide
Complete Teardown, Cleaning/Lubrication, and Reassembly of the Olympus BH2-CH Substage Assembly
Figure
Figure
102).
Apply a light coating of grease onto the two beveled
bearing surfaces of the dovetail slide (see
Figure 103 – Grease beveled surfaces of dovetail slide
Carefully engage the greased condenser slide with the
dovetail blocks on the main housing (see
Figure 104 – Engage condenser slide with dovetail blocks
Rotate the condenser-height knob counter-clockwise
until the hole in the condenser slide aligns with the
tapped hole in the main housing (see
Figure 105 – Align the hole in slide with the tapped hole
Use a suitable slotted screwdriver to reinstall the
M2.6x4 condenser-slide stop screw through the hole in
the condenser slide and into the tapped hole in the
main housing (see
Figure
Figure
103).
Figure
104).
Figure
105).
106).
Revision 1
Page 24 of 26