Cisco ASR 920 series Manuel - Sayfa 23
Anahtar Cisco ASR 920 series için çevrimiçi göz atın veya pdf Manuel indirin. Cisco ASR 920 series 36 sayfaları. Aggregation services router
Ayrıca Cisco ASR 920 series için: Kurulum Kılavuzu (36 sayfalar), Başlarken (6 sayfalar), Kurulum Kılavuzu (42 sayfalar), Donanım Kurulum Kılavuzu (46 sayfalar)
Installing the Cisco ASR 920 Series Router
Figure 21: Stripping a Ground Wire
Step 2
Slide the open end of your 2-hole ground lug over the exposed area of the ground wire.
Step 3
Using a crimping tool (as specified by the ground lug manufacturer), crimp the ground lug to the ground wire as shown
in the figure below.
Figure 22:
Step 4
Use a Phillips head screwdriver to attach the 2-hole ground lug and wire assembly to the router with the 2 pan-head
Phillips head screws.
Step 5
Connect the other end of the ground wire to a suitable grounding point at your site.
Power Connection Guidelines
This section provides guidelines for connecting the device power supplies to the site power source.
Warning
Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground
conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that
suitable grounding is available. Statement 1024
Warning
The plug-socket combination must be accessible always because it serves as the main disconnecting device.
Statement 1019
Power Connection Guidelines
Installing the Cisco ASR 920 Series Router
23