Siemens TOP WD 1200 Çalıştırma ve Kurulum Talimatları - Sayfa 23

Yıkayıcı Siemens TOP WD 1200 için çevrimiçi göz atın veya pdf Çalıştırma ve Kurulum Talimatları indirin. Siemens TOP WD 1200 28 sayfaları.

Siemens TOP WD 1200 Çalıştırma ve Kurulum Talimatları
Align the machine
Fig. 8
! The machine must be perfectly level with all
four feet standing on the floor. It must not
rock from side to side.
Use a spirit level to align the machine on all
sides.
If necessary, correct the height of the machine s
feet.
1. Undo the lock nuts.
2. Adjust the height of the feet.
3. Tighten the lock nuts again firmly to ensure
that the feet remain at the same height.
Water supply - cold only
Fig. 19 , 21 , 22
For the water connection a standard cold-
water line with a minimum water pressure
of 0.1 MPa is required (with tap full ON, at
least 8 liters of water must flow out in one
minute). If the water pressure exceeds 1 MPa,
,
a pressure reducing valve must be added.
! Never connect the machine to the mixer tap
of a pressureless hot-water heater.
! Caution! Connections are under full water
pressure; check for leaks with tap turned
fully ON.
! The filters at the free end of the inlet hose
and at the back of the machine should only
be removed for cleaning purposes.
! To avoid water damage, the tap must be
turned OFF after using the machine.
! The plastic nuts on the hose connections
must only be tightened by hand.
The face of the water tap must be free
of burrs and sharp edges.
en
21