Cisco 1262 Kurulum Kılavuzu - Sayfa 4

Kablosuz Erişim Noktası Cisco 1262 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Cisco 1262 5 sayfaları.

Cisco 1262 Kurulum Kılavuzu

Confirm access point power

There is a small LED on the face of the access point,
shown in Figure 8 as the small black square above the
CISCO label.
When the access point is receiving power, the LED
should illuminate green. The LED may flash initially and
then become solid green. This confirms the access
point is powered on.

FCC compliance

This equipment has been tested and found to comply
with the limits for a Class B digital device, pursuant to
part 15 of the FCC Rules. These limits are designed to
provide reasonable protection against harmful
interference when the equipment is operated in a
commercial environment. This equipment generates,
uses, and can radiate access point frequency energy
and, if not installed and used in accordance with the
installation instructions, may cause harmful interference
to access point communications.
You are cautioned that any changes or modifications
not expressly approved by the party responsible for
compliance could void the user's authority to operate
the equipment.
4

Contact information

North America:
855-MOBVIEW (662-8839)
Latin America:
561-998-6114
Web site:
www.interlogix.com/mobileview
Cisco 1262 Access Point Installation Manual