NTP- A13 Perform the Shelf Installation Acceptance Test
Figure 1-13
Installing the Rear Cover with Standoffs
Stop. You have completed this procedure.
NTP-A13 Perform the Shelf Installation Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures Applicable procedures in Chapter 1
Required/As Needed
Onsite/Remote
Security Level
The covers are an integral part of the safety design of the product. Do not operate the unit without the
Warning
covers installed.
Step 1
Complete
Cisco ONS 15454 Procedure Guide, Release 8.5.1
1-30
Use this procedure to perform a shelf installation acceptance test.
Voltmeter
Required
Onsite
None
Table 1-5
by verifying that each applicable procedure was completed.
Chapter 1 Install the Shelf and Backplane Cable