Cisco ONS 15454 Kurulum - Sayfa 9

Sunucu Cisco ONS 15454 için çevrimiçi göz atın veya pdf Kurulum indirin. Cisco ONS 15454 32 sayfaları. Four-shelf and zero-shelf bay assembly
Ayrıca Cisco ONS 15454 için: Kurulum Talimatları Kılavuzu (22 sayfalar), Kurulum (32 sayfalar), Paketten Çıkarma ve Kurulum (42 sayfalar), Paketten Çıkarma ve Kurulum (40 sayfalar)

Cisco ONS 15454 Kurulum
Chapter 1 Install the Shelf and Backplane Cable
Note
Step 7
Continue with the
Stop. You have completed this procedure.
NTP-A6 Install the Power and Ground
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Before performing any of the following procedures, ensure that power is removed from the DC circuit.
Warning
Statement 1003
This equipment is intended to be grounded. Ensure that the host is connected to earth ground during
Warning
normal use. Statement 39
Use copper conductors only. Statement 1025
Warning
78-18537-01
To attach cables to the EIAs, see the
Backplane" procedure on page
"NTP-A6 Install the Power and Ground" procedure on page
This procedure installs power feeds and grounds the ONS 15454.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Screws
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper
conductors, 194 degrees F (90 degrees C)
Ground cable (from equipment frame to office ground), #6 AWG stranded
Listed pressure terminal connectors, typically dual lug type; connectors
must be suitable for #6 AWG copper conductors with stud size and spacing
per equipment rack specifications; connection to office ground typically
through H-TAP compression connector, according to site practice
Wire cutters
Wire strippers
Crimp tool
Fuse panel
NTP-A4 Remove the Backplane Covers, page 1-7
Required
Onsite
None
"NTP-A9 Install the Electrical Card Cables on the
1-22.
Cisco ONS 15454 Procedure Guide, Release 8.5.1
NTP- A6 Install the Power and Ground
1-9.
1-9