Cisco UCS 250 Kurulum - Sayfa 5
Sunucu Cisco UCS 250 için çevrimiçi göz atın veya pdf Kurulum indirin. Cisco UCS 250 10 sayfaları.
Power Up the KVM
Complete these steps in order to power up the server:
1.
Plug the power cord into the chassis.
Note:
♦
CIMC initializes system standby (Power Off mode).
♦
CIMC is active and can be controlled through GUI or CLI, if you know the IP address.
2.
Depress Front Panel Power:
♦
The Fans begins to spin up.
♦
Then POST sequence begins.
♦
At this point you can either boot up or begin the installation process.
♦
Note that for large memory, models can display a blank screen for several minutes.
♦
For C−250If you immediately depress the power switch, you interrupt the CIMC
initialization.