Cisco UCS B200 Kurulum ve Servis Notu - Sayfa 20

Sunucu Cisco UCS B200 için çevrimiçi göz atın veya pdf Kurulum ve Servis Notu indirin. Cisco UCS B200 31 sayfaları. Blade server
Ayrıca Cisco UCS B200 için: Veri Sayfası (8 sayfalar)

Cisco UCS B200 Kurulum ve Servis Notu
Removing a Blade Server Cover
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
Figure 10

Installing a CPU and Heat Sink

Before installing a new CPU in a server, verify the following:
To install a CPU and heat sink, follow these steps:
Step 1
Place the CPU on the base with the notches aligned to the pins on the base. See
Cisco UCS B200 Blade Server Installation and Service Note
20
Removing The Heat Sink and Accessing the CPU Socket
2
1
1
3
5
The CPU is supported for that model server.
A BIOS is available and installed that supports the CPU/DIMM and server combination.
The service profile for this server in UCS Manager will recognize and allow the new CPU. This is
especially important if you have been using a single processor and install a second processor.
1
1
4
Figure
11, callout 1.
OL-22473-02