Alemite 7340 Servis Kılavuzu - Sayfa 6
Kablolar ve konektörler Alemite 7340 için çevrimiçi göz atın veya pdf Servis Kılavuzu indirin. Alemite 7340 12 sayfaları. High-capacity
Ayrıca Alemite 7340 için: Servis Kılavuzu (16 sayfalar)
SER 7340
Ribbed-Neck Bolts
IMPORTANT: Make sure the longer Bolts
(31) mount on the Pawl Assembly side of the
Base Assembly.
5. Install Bolts (31 and 30) and Washers (29) onto the
Base Assembly as required.
Sheave Assembly
6. Secure Shaft and Flange Assembly (3) to Sheave
Assembly (2) with Screws (5) and Nuts (1).
7. Secure Ratchet (35) to the Sheave Assembly with
Screws (5) and Nuts (1).
Model Dependent Step
8. Screw Bushing (7) [with thread sealant] into Shaft (8).
• Tighten the Bushing securely.
9. Screw 90 ° Union (6) [with thread sealant] into the
Shaft {or Bushing}.
• Make sure the 90 ° Union orients properly.
See Figure 2.
• Tighten the 90 ° Union securely.
10. Install the Shaft and 90 ° Union assembly into the
Ratchet.
11. Position the Sheave Assembly (with attached
components) onto the Base Assembly.
• Make sure the Ratchet side faces the Pawl.
Bearings and Arbor
12. Install Bearing (28) into Bearing Housing (27).
IMPORTANT: Make sure the extended por-
tion of the Bearing faces inward. See Fig-
ure 2.
13. Install the first Bearing and Housing assembly
(extended side first) onto Shaft (8) and onto the Bolts.
14. Attach the Bearing and Housing assembly to the Base
Assembly with Nuts (1).
• Do not tighten the Nuts at this time.
15. Install the second Bearing and Housing assembly
(extended side first) onto the Shaft and Flange
Assembly and onto the Bolts.
16. Secure the Bearing assembly to the Base Assembly
with Nuts (1).
• Tighten the Nuts alternately and evenly.
Revision (2-03)
17. Tighten the Nuts on the opposite Bearing alternately
and evenly.
18. Install Retaining Ring (16) onto the Shaft.
• Make sure the hex on the Shaft engages the hex
socket in the Ratchet and the 90 ° Union orients
properly with the Sheave Assembly. See Figure 2.
19. Install and hold Square Key (4) into the slot of the
Shaft and Flange Assembly.
20. Slide Spring Arbor (26) [flat side first] onto the Shaft
and onto the Key.
21. Install Retaining Ring (16) onto the Shaft and Flange
Assembly.
Power Spring Assembly and Arms
22. Remove Button Plug (15) from the Power Spring
Assembly.
• Use a blunt tool from behind the Plug to "pop" it
from the case.
H I N T: O r i e n t t h e h o o k o n t h e P o w e r
Spring's inner coil to properly engage the
recess in the Arbor. Lift and center the coil
within the case during installation.
23. Install the Power Spring Assembly onto the Arbor.
• Make sure the end of the power spring properly
engages the Arbor.
IMPORTANT: Use care not to damage the
gasket.
24. Align the bolt holes in the Power Spring Assembly
with the Base Assembly.
25. Secure the Power Spring Assembly to the Base
Assembly with Screws (5).
26. Install the Button Plug into the case of the Power
Spring Assembly.
NOTE: The Hose Guide Arms can attach to
the Base Assembly in five (5) different posi-
tions. Select the required relationship of the
Guide to the mounting plate of the Base
Assembly.
27. Secure Long Arm (34) to the Base Assembly with Nuts
(13).
• Do not tighten the Nuts at this time.
28. Secure Short Arm (14) to the Power Spring Assembly
with Screws (5) and Nuts (1) as required.
• Do not tighten the Screws at this time.
6
High-Capacity Reel
Alemite Corporation