Aerial Ascent 2.0 Kurulum Kılavuzu - Sayfa 7
Tekne Ekipmanları Aerial Ascent 2.0 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Aerial Ascent 2.0 7 sayfaları.
STEP 10 - FOLDING ThE TOWER
rEMovE fasTEnErs
froM BoTh sIDEs
of ThE ToWEr.
To fold the tower we recommend removing the 2 fasteners that connect the top of each rear
leg to the front legs. This will allow you to fold the rear legs back (or remove them) and allow
the front legs to fold back and rest on the deck of the boat. The fasteners that connect the
legs to the mounts may also require loosening before folding the tower.
When folding the tower down you will notice that the tower mounts will rotate on the nylon
washers located under the mount on the surface of the deck.
Before using the tower again, be sure to check and tighten all the fasteners that may have
been loosened or removed during the folding process.
•
Be sure to check and tighten all fasteners and connection points prior to every use.
•
be cautious when towing or driving under obstacles, low hanging structures or trees with
your tower up.
•
Use soap and water or general cleaners to clean your tower. Avoid abrasive materials that
might scratch the towers finish.
7
CARE & MAINTENANCE
Questions?
loWEr ThE fronT anD rEar lEGs
ToWarDs ThE sTErn of ThE BoaT
www.aerialwakeboarding.com
www.aerialwakeboarding.com
MoUnTs WIll
roTaTE slIGhTly
GUIDE#: BT-ascEnT-001