Aerial Assault Wakeboard Tower Kurulum Kılavuzu - Sayfa 13

Tekne Ekipmanları Aerial Assault Wakeboard Tower için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Aerial Assault Wakeboard Tower 13 sayfaları.

STEP 20 - LOWERING ThE TOWER

STEP 21 - INSTALLING ThE NAVIGATION LIGhT
nAVIGATIon LIGhT
(SHIppeD SepArATeLY)
13
Lowering the tower requires at least 2 people.
Never trailer your boat with the tower in the lowered position.
Always check to make sure all fasteners are tight and secure before
using the tower again.
opTIon A
DISconnEcT
The navigation light is shipped separately.
It is designed to be installed on the top of the tow point.
For a clean wiring installation the wires supplied can be passed
through the center of the tow point, along the inside of the top-sec-
tion and down inside the front leg tube. The wires will need to exit the
front leg tube just above the fittings and then be passed over the fit-
tings before entering back into the side rail front tube. Finally the wires
will exit the side rail front tube just above the mounting foot and then
enter the deck of the boat (through a hole that will need to be drilled)
so that they can be connected to a switch and power source.
Note: The tower is not supplied with pre-drilled wiring holes as each
customer may have a different wiring requirement depending on how
they fold their tower or the accessories that they will mount to the
tower.
Questions?
LooSEn
www.aerialwakeboarding.com
opTIon b
DISconnEcT
LooSEn
GUIDE#: pwb-ASSAULT-004