ClearSpan Storage Master Solarguard Kullanım Kılavuzu - Sayfa 17
Çadır ClearSpan Storage Master Solarguard için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. ClearSpan Storage Master Solarguard 20 sayfaları. Poly shelter round “hut” style 30' wide x 15' high x 48' long
Warning: DO NOT INSTALL COVER ON A WINDY DAY AS DAMAGE TO IT MAY RESULT!
Step 5: Unpack the main cover and unfold it completely with the inside surface facing up.
Step 6: Locate the ends with strapping and line them up with the front and back of the shelter.
Step 7: Slide cover conduits into hem openings as shown in the next illustration.
Step 8: To pull the cover over the frame, attach ropes to both ends of the cover conduit. Wrap the
rope around the conduit a few times as shown below to prevent it from slipping off accidentally.
Long shelters require additional ropes at every rafter where you installed a ratchet. If your cov-
erʼs hem was notched at the factory, you can attach additional ropes at these locations. If your
cover was not notched at the factory, you can cut a small slit in the hem just inside of the cover
conduit (see photos on next page), pass the rope through and tie a bowline knot.
Step 9: Throw the ropes up and over the frame and then pull the cover over the frame. You need
one person at each rope for this step.
Page 17