ClearWater CTA5 Kurulum Talimatları - Sayfa 3
Sıhhi Tesisat Ürünleri ClearWater CTA5 için çevrimiçi göz atın veya pdf Kurulum Talimatları indirin. ClearWater CTA5 3 sayfaları. Crystal single lever bath filler, crystal single shroud
INSTALLATION INSTRUCTIONS
Crystal single Shroud -
Important
Installation
2.5mm
ALLEN
KEY
M5X4mm
GRUB
SCREW
2.5mm
ALLEN
KEY
HOT INLET
1. Before installation, please flush the water system to ensure that no metal swarf, solder, and other impurities can enter the product.
2. Turn off water supply before commencing work, this should be done at the isolating valves of inlet feeds if fitted or main stopcock.
3. Build up water inlet pipe from ground.
4. Take away the washer and fixing nut before you install the bath tap on the standing tube.
5. Screw off the cover nut from standing tube.
6. Screw on the cover nut on the bath tap tail (no supplied). Then screw on the copper tubes (no supplied) also.
7. Slide the copper tubes into the standing tube and tighten the cover nut. Ensure that whilst installing the standing tube, the bath tap
is facing the correct direction.
8. Place the standing tube center of inlet pipe, and mark holes as per the bottom plate, drill and insert plug (if it is necessary).
9. Rise the standing tube on the inlet pipe, and fix the copper tubes to the inlet pipe.
10. Fix the standing tube on the floor with the supplied fittings (2 style screw & plug supplied, one is for Brick/Breezeblock floor,
the other is for wooden floor), finally put on the caps.
Maintenance
We do NOT recommend you use any household cleaners to clean the product. Because these cleaners change substance or formula
too frequently. The product should be always cleaned only with soapy water and rinsed with clean water and dried with a soft cloth.
W24
BATH TAP TAIL (no supplied)
COPPER TUBE (no supplied)
COVER NUT
STANDING TUBE
CAP
4x
CONNECTOR
INLET PIPE (no supplied)
COLD INLET
Dimension
SCREW
PLUG
1 - 1
Ø55
M34X1.5
Ø100
Ø130
B