Step 1: Front Wall: Position wall sheet on the right hand side
of the doorway with the sheet LIP on the left hand
side. Ensuring the LIP is flush with the side of the
Stud and the top is 45mm below the top of the Ridge
Beam, tack in place.
Step 2: Back Wall: Position the first Wall Sheet with
the LIP on the right hand side. Ensuring the LIP
is flush with the side of the corner Stud and the
top of the Wall Sheet is 45mm down from the
top plate, tack in place. Position the next Wall
Sheet with the LIP on the right hand side. Over-
lap as shown in fig 1 pg 6. Ensuring Wall Sheet
is 45mm down from the top plate, tack in place.
Step 3: End Walls: Position wall sheet with the LIP
flush with the side of the stud and the top of
the Wall Sheet is flush with the top of the Top
Plate, tack in place. Repeat with the other end.
If fitting a window, nail in Window Studs and
Nog now. Refer to Window instructions—Pg.8
Step 4: Nailing Off: Nail one 30mm Clout each side of the Rib (two per Pan) into the Top Plates and Bottom Plates. Nail
Wall Sheets to mid wall Nogs (one per pan). Nail each corner Wall Sheet to Studs using two 30mm Clouts evenly
spaced.
KS1 WALL CLADDING
8
EDGE
FLUSH