Duro Dyne SSFU Посібник користувача - Сторінка 6
Переглянути онлайн або завантажити pdf Посібник користувача для Фарборозпилювач Duro Dyne SSFU. Duro Dyne SSFU 8 сторінок. Adhesive applicator
OPERATION
OPERATION
Starting and Adjusting the Pump: (see Figure-3 below)
1 - Check that all fittings are tight. Be sure to use a compatible liquid thread sealant or Teflon tape on all
male threads. Tighten the Fluid Inlet and Fluid Outlet fitting into the Pump.
2 - Place the finished Pump Assembly onto either a 5 gallon pail or a 55 gallon drum with tubing into the
fluid. Ensure stability when placing on a 5 gallon pail.
3 - Make sure the Air Regulators are closed. Open the Re-circulating Valve.
4 - Connect the air-line quick disconnect to the Air Inlet Fitting.
5 - With the Gun Air Regulator closed, open the Pump Air Regulator.
6 - Allow the Pump to cycle slowly until all air is pushed out of the Re-circulation Tube and the Pump is
primed.
7 - Trigger the Spray Gun. Open the Gun Air Regulator and close the Fluid Drain Valve. Allow the Pump to
cycle slowly until all air is pushed out of the Fluid Hose and Spray Gun.
If Pump Fails: (see Figure-3 below)
Lower the air pressure with a 1/8" flat-head screwdriver. Give the reset valve on the front of the Pump a
1/16" turn left or right. Pump should reset and begin cycling. This may need to be repeated 2 or 3 times.
Re-circulating Line: (see Figure-3 below)
The Re-circulation Tube drains unused fluid back into the fluid container, ensuring an even flow at the Gun.
Re-circulation also provides gentle fluid agitation. Tore-circulate fluid, open the Re-circulating Valve while you
are spraying. To stop re-circulation, close the valve.
Operating Pressure:
Air.............60-70psi
Fluid..........60-70psi
Figure 3:
Black
Spray Gun
Fluid Hose
Pump
Air Inlet
Fitting
Re-Circulating
Valve
Red
Air Hose
Gun Air
Regulator
Pump Air
Regulator
Re-Circulation Tube
Suction Tube
6