Galvin Engineering Flowmatic TZ-FLOWSENC24 Інструкції з монтажу - Сторінка 6

Переглянути онлайн або завантажити pdf Інструкції з монтажу для Сантехнічний виріб Galvin Engineering Flowmatic TZ-FLOWSENC24. Galvin Engineering Flowmatic TZ-FLOWSENC24 11 сторінок. Ss face plate w/ concealed 24v ac wall sensor

Product Installation Guidelines
(NOT SUPPLIED)
5. Connect power supply & Check for correct operation
− The 24V AC transformer (not supplied) is plugged into a
standard mains power point (GPO).
− Turn on the power point and test the unit.
− Wave the back of your hand through the beam to turn
the water on and again to turn the water off.
− The sensor may require adjustment. Please ensure that
the sensor is in a position that reflects the actual
installation
Note: The sensor is factory set to medium and will
need to be adjusted to suit individual installations.
All electrical components should be protected
from contact with water or excessive heat and
installed in accordance with local regulations.
The connection of this product to mains power
supply should be undertaken by a competent
person and should conform to local Wiring
Regulation – AS3000 Wiring rules.
Note: For transformer supply and orders please contact
Galvin Specialised
© Galvin Engineering Pty Ltd
Typical Installation
Version 1.1, 30 April 2021, Page 6 of 11