Miller CoolBand II Оригінальна інструкція з експлуатації - Сторінка 29
Переглянути онлайн або завантажити pdf Оригінальна інструкція з експлуатації для Зварювальне приладдя Miller CoolBand II. Miller CoolBand II 40 сторінок. Integrated headgear cooling system
3-9.
Checking Headgear Cooling System Before
Use (Continued)
.
Do not restrict or al-
ter headgear cool-
ing system air flow.
Do not block air
holes (including up-
per
and
holes).
Be
safety glasses, hair,
weld cap, and other
objects do not block
air flow.
Before using the headgear
cooling system, check the
following items:
1
Filter
.
Filter is required for
proper operation of
equipment, but does
not provide respirat-
ory protection.
OM-262 902 Page 26
NOTICE −Operating cool-
ing system without a filter
will damage fan motor and
void warranty.
Verify the filter is undam-
lower
aged, properly assembled,
sure
and securely connected to
the blower assembly.
2
Flexible Tube
Be sure the tube is undam-
aged and properly con-
nected to the manifold and
blower assembly.
3
Battery
Verify the battery is fully
charged and secured in
the battery compartment.
4
Power Switch
Turn on blower assembly
and test air flow.
5
Air Deflector
To adjust direction of air
flow, remove air deflector
(see Section 3-7).
6
Shroud (Not Shown)
Inspect the shroud and re-
place if damaged. See
Troubleshooting (Section
4-4) if air is not being sup-
plied to front of helmet.
Put on helmet and adjust
headgear so helmet fits
snugly on head. Verify
shroud is properly installed
on helmet.
.
See Section 4 (Miller
helmet) or the weld-
ing helmet Owner's
Manual for helmet ad-
justment information.