Miller CoolBand II Oryginalna instrukcja obsługi - Strona 29

Przeglądaj online lub pobierz pdf Oryginalna instrukcja obsługi dla Akcesoria spawalnicze Miller CoolBand II. Miller CoolBand II 40 stron. Integrated headgear cooling system

Miller CoolBand II Oryginalna instrukcja obsługi
3-9.
Checking Headgear Cooling System Before
Use (Continued)
.
Do not restrict or al-
ter headgear cool-
ing system air flow.
Do not block air
holes (including up-
per
and
holes).
Be
safety glasses, hair,
weld cap, and other
objects do not block
air flow.
Before using the headgear
cooling system, check the
following items:
1
Filter
.
Filter is required for
proper operation of
equipment, but does
not provide respirat-
ory protection.
OM-262 902 Page 26
NOTICE −Operating cool-
ing system without a filter
will damage fan motor and
void warranty.
Verify the filter is undam-
lower
aged, properly assembled,
sure
and securely connected to
the blower assembly.
2
Flexible Tube
Be sure the tube is undam-
aged and properly con-
nected to the manifold and
blower assembly.
3
Battery
Verify the battery is fully
charged and secured in
the battery compartment.
4
Power Switch
Turn on blower assembly
and test air flow.
5
Air Deflector
To adjust direction of air
flow, remove air deflector
(see Section 3-7).
6
Shroud (Not Shown)
Inspect the shroud and re-
place if damaged. See
Troubleshooting (Section
4-4) if air is not being sup-
plied to front of helmet.
Put on helmet and adjust
headgear so helmet fits
snugly on head. Verify
shroud is properly installed
on helmet.
.
See Section 4 (Miller
helmet) or the weld-
ing helmet Owner's
Manual for helmet ad-
justment information.