al dente DUNAFORM Betriebsanleitung - Seite 5

Blättern Sie online oder laden Sie pdf Betriebsanleitung für Zahnärztliche Ausrüstung al dente DUNAFORM herunter. al dente DUNAFORM 8 Seiten. Pressure thermo-forming unit for foil 120 mm and 125 mm

al dente DUNAFORM Betriebsanleitung

6.2 Mains supply

The electrical connection of the unit is only allowed in rooms which are equipped according to the directions of
VDE 0107 or IEC 364-710. Put the power cable included in the delivery into the female connector installed (15) and into
an earthed wall socket. Due to safety reasons do not use flexible distributing sockets or extender cables. The power
socket has to be fused with at least 10 A.

6.3 Compressed air connection

Connect the unit by means of a pressure hose to the pressure connector socket (16) and to the on site compressed
air supply or to a compressor. MS-fitting for pressure hose 6 mm Ø inside is within the scope of supply.
On delivery of the unit the working pressure is set at 5 bar.
The pressure in the pipes must not exceed 6 bar, the safety valve opens at 6,2 bar.

6.4 Selection of language

You can select one of the following languages:
German
English
Spaish
Italian

7. OPERATING THE DUNAFORM

7.1 Operating elements

By pressing the button (7) "Enter" (for approx. 5 sec.), the menu for
adjusting the language is selected.
The display (4) shows the language selected.
By pushing the button (6) „Plus" the language desired can be chosen.
Confirm using button (7) ) „Enter".
1 Foil tension ring
2 Foil reception for foil Ø 120 mm and Ø 125 mm
3 Heating cap (infrared lamp)
4 Display
5 Button „Minus"
6 Button „Plus"
7 Button „Enter"
8 Pressure regulator
9 Pressure chamber
10 Reception for granules and plate reception
11 Pressure gauge
12 Closing device for pressure chamber
13 Power switch ON-OFF
14 Fuse carrier with fuses T 4 A
15 Female connector installed
16 Pressure connector socket
5