al dente DUNAFORM Betriebsanleitung - Seite 6
Blättern Sie online oder laden Sie pdf Betriebsanleitung für Zahnärztliche Ausrüstung al dente DUNAFORM herunter. al dente DUNAFORM 8 Seiten. Pressure thermo-forming unit for foil 120 mm and 125 mm
7.2 Relevant information for operating the unit
Unlock the pressure chamber (9) by turning the closing device (12)
counter-clockwise.
Lift off the pressure chamber (9) and swivel it for 180° all the way.
Turn the foil tension ring (1) clockwise and take it off.
Insert the foil (17) centrically into the foil reception (2). Insert the foil tension
ring (1) and turn it as far as it will go counter-clockwise.
Working with the plate reception:
Put the model (18) onto the plate reception (19).
Working with granules:
Remove the plate reception (19) as well as the spacer ring from the granular
reception.
Fill the granules into the granular reception (10) or into the insert bowl
Embed the model (18) into the granules.
Turn on the unit on the power switch (13).
Program heating time by pushing the buttons (5), (6) and (7).
Button (5) „Minus"
Button (6) „Plus"
Button (7) „Enter" confirm.
The necessary heating time depends on the thickness of the foil and is
mentioned on the wrapping of the foil.
The cooling down period is automatically determined. By applying the
Buttons (5), (6) and (7), it can be manually programmed.
Button (5) „Minus"
Button (6) „Plus"
Button (7) „Enter" confirm.
When too hot, the unit is deactivated by a thermo-switch. Please switch
off the unit by means of the power switch (13) for 30 minutes.
6