Daikin FTE50KV19 Service-Handbuch - Seite 12
Blättern Sie online oder laden Sie pdf Service-Handbuch für Klimageräte Daikin FTE50KV19 herunter. Daikin FTE50KV19 20 Seiten. Removal procedure, 5.0/6.0/7.1 kw class, 15000/18000 btu/h class
Auch für Daikin FTE50KV19: Service-Handbuch (20 seiten)
![Daikin FTE50KV19 Service-Handbuch](/uploads/products/server2/1534726/1534726.jpg)
PCBs
7. PCBs
Warning
Step
1
Remove the screw on
the electrical box.
2
Unfasten the hook and
remove the shield plate.
3
Unfasten the 2 hooks
on the top and remove
the signal receiver unit.
10
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Electrical box
Shield
plate
Hook
(R17747)
(R13224)
Signal receiver
unit
(R2781)
Si041254EE
Points
The shield plate also has 2
hooks on the upper side (at
the back).
Removal Procedure