Daikin FTE50KV19 Manuel d'entretien - Page 12
Parcourez en ligne ou téléchargez le pdf Manuel d'entretien pour {nom_de_la_catégorie} Daikin FTE50KV19. Daikin FTE50KV19 20 pages. Removal procedure, 5.0/6.0/7.1 kw class, 15000/18000 btu/h class
Également pour Daikin FTE50KV19 : Manuel d'entretien (20 pages)
PCBs
7. PCBs
Warning
Step
1
Remove the screw on
the electrical box.
2
Unfasten the hook and
remove the shield plate.
3
Unfasten the 2 hooks
on the top and remove
the signal receiver unit.
10
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Electrical box
Shield
plate
Hook
(R17747)
(R13224)
Signal receiver
unit
(R2781)
Si041254EE
Points
The shield plate also has 2
hooks on the upper side (at
the back).
Removal Procedure