daltile One Quartz Series Installationshandbuch - Seite 8
Blättern Sie online oder laden Sie pdf Installationshandbuch für Inneneinrichtung daltile One Quartz Series herunter. daltile One Quartz Series 15 Seiten. Fabrication instructions
Daltile
Full Sub Top Support
Many installers prefer to use a full sub top rather than support strips. A full sub top has some
advantages and is required in areas of overhang and cantilever.
Recommended materials for full sub tops
•
•
•
When installing a full sub top, do not seam the sub top material in the same location as the
counter top material. Avoid seams in cabinetry whenever possible.
When using either full sub top support or full perimeter support, the material must be attached
tightly to the cabinets and be flat and leveled.
8
¾" moisture resistant MDF
¾" moisture resistant plywood
Particle board is not acceptable for use as support.
ONE Quartz