daltile One Quartz Series Manual de instalação - Página 8

Procurar online ou descarregar pdf Manual de instalação para Mobiliário de interior daltile One Quartz Series. daltile One Quartz Series 15 páginas. Fabrication instructions

Daltile

Full Sub Top Support

Many installers prefer to use a full sub top rather than support strips. A full sub top has some
advantages and is required in areas of overhang and cantilever.
Recommended materials for full sub tops
When installing a full sub top, do not seam the sub top material in the same location as the
counter top material. Avoid seams in cabinetry whenever possible.
When using either full sub top support or full perimeter support, the material must be attached
tightly to the cabinets and be flat and leveled.
8
¾" moisture resistant MDF
¾" moisture resistant plywood
Particle board is not acceptable for use as support.
ONE Quartz