daltile One Quartz Series 설치 매뉴얼 - 페이지 8
{카테고리_이름} daltile One Quartz Series에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. daltile One Quartz Series 15 페이지. Fabrication instructions
Daltile
Full Sub Top Support
Many installers prefer to use a full sub top rather than support strips. A full sub top has some
advantages and is required in areas of overhang and cantilever.
Recommended materials for full sub tops
•
•
•
When installing a full sub top, do not seam the sub top material in the same location as the
counter top material. Avoid seams in cabinetry whenever possible.
When using either full sub top support or full perimeter support, the material must be attached
tightly to the cabinets and be flat and leveled.
8
¾" moisture resistant MDF
¾" moisture resistant plywood
Particle board is not acceptable for use as support.
ONE Quartz