Anytrek ThermoTrack VT2002 Installationshandbuch - Seite 5

Blättern Sie online oder laden Sie pdf Installationshandbuch für Tank-Ausrüstung Anytrek ThermoTrack VT2002 herunter. Anytrek ThermoTrack VT2002 7 Seiten. Solar powered 4g connected tanker thermometer with gps tracking

Part II:Install ThermoTrack
(Suitable for 3-inch mounting hole)
Step 2. Insert insulation foam
1.Run the sensor connector through the hole.
2.Keep no space gap to ensure insulation.
Step 3. Install Pad
Pad Flange holder
Insulation foam Thickness not
less than 2 inches
Pad Flange holder