Anytrek ThermoTrack VT2002 설치 매뉴얼 - 페이지 5
{카테고리_이름} Anytrek ThermoTrack VT2002에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anytrek ThermoTrack VT2002 7 페이지. Solar powered 4g connected tanker thermometer with gps tracking
Part II:Install ThermoTrack
(Suitable for 3-inch mounting hole)
Step 2. Insert insulation foam
1.Run the sensor connector through the hole.
2.Keep no space gap to ensure insulation.
Step 3. Install Pad
Pad Flange holder
Insulation foam Thickness not
less than 2 inches
Pad Flange holder