Anytrek ThermoTrack VT2002 Manuale di installazione - Pagina 5
Sfoglia online o scarica il pdf Manuale di installazione per Apparecchiature per serbatoi Anytrek ThermoTrack VT2002. Anytrek ThermoTrack VT2002 7. Solar powered 4g connected tanker thermometer with gps tracking
Part II:Install ThermoTrack
(Suitable for 3-inch mounting hole)
Step 2. Insert insulation foam
1.Run the sensor connector through the hole.
2.Keep no space gap to ensure insulation.
Step 3. Install Pad
Pad Flange holder
Insulation foam Thickness not
less than 2 inches
Pad Flange holder