Anzzi SB-AZ009WC Handbuch für Installation und Betrieb - Seite 8
Blättern Sie online oder laden Sie pdf Handbuch für Installation und Betrieb für Sanitärprodukt Anzzi SB-AZ009WC herunter. Anzzi SB-AZ009WC 14 Seiten. Shower base
Auch für Anzzi SB-AZ009WC: Handbuch für Installation und Pflege (8 seiten)
STEP 7
Allow the mortar to completely harden before applying weight to the bottom of the shower
●
tray.
Install the Drywall above the tile flanges and secure it to the studs.
●
Put the tiles (or other finishing wall material) over the drywall leaving 1/8" gap between the
●
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.7)
Caulk
STEP 8
Apply a bead of sealant between the apron
●
and finished floor and wait for 24 hours
before using the shower. (Fig.8)
1
3
4
1/8"
gap
Base
Side View
Fig. 7
2
Waterproof Drywall to the
top of the tile flange
Stud
Drywall
Finished wall overlaps the
dry wall and tile flange
Fig. 8
2
e
6