Anzzi SB-AZ009WC Kurulum ve Kullanım Kılavuzu - Sayfa 8
Sıhhi Tesisat Ürünleri Anzzi SB-AZ009WC için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Kılavuzu indirin. Anzzi SB-AZ009WC 14 sayfaları. Shower base
Ayrıca Anzzi SB-AZ009WC için: Kurulum ve Bakım Kılavuzu (8 sayfalar)
STEP 7
Allow the mortar to completely harden before applying weight to the bottom of the shower
●
tray.
Install the Drywall above the tile flanges and secure it to the studs.
●
Put the tiles (or other finishing wall material) over the drywall leaving 1/8" gap between the
●
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.7)
Caulk
STEP 8
Apply a bead of sealant between the apron
●
and finished floor and wait for 24 hours
before using the shower. (Fig.8)
1
3
4
1/8"
gap
Base
Side View
Fig. 7
2
Waterproof Drywall to the
top of the tile flange
Stud
Drywall
Finished wall overlaps the
dry wall and tile flange
Fig. 8
2
e
6