Anzzi SB-AZ009WC Kurulum ve Kullanım Kılavuzu - Sayfa 7
Sıhhi Tesisat Ürünleri Anzzi SB-AZ009WC için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Kılavuzu indirin. Anzzi SB-AZ009WC 14 sayfaları. Shower base
Ayrıca Anzzi SB-AZ009WC için: Kurulum ve Bakım Kılavuzu (8 sayfalar)
STEP 5
Apply a generous amount of mortar that
●
has been mixed to a thick consistency.
Place the base in the wet mortar, adjust
until it is level, and let mortar cure for
24 hours. Proceed to the next step. (Fig 5)
STEP 6
It is recommended not to stand in base
●
while securing to wall. Set base in corner
and press it into mortar.
Secure flanges to all studs with #8(1-1/2")
screws through previously drilled holes.
(Fig 6)
IMPORTANT: Gaps between flanges and
studs must be less than 1/8". Insert shims
to fill gaps if needed.
Mortar
Fig. 5
Shim
Fig. 6
5