Hi-Flame GloFire 905 Installations- und Betriebsanleitung - Seite 8

Blättern Sie online oder laden Sie pdf Installations- und Betriebsanleitung für Elektrischer Heizer Hi-Flame GloFire 905 herunter. Hi-Flame GloFire 905 16 Seiten. Horse flame glofire 905 room heater - installation and operating instructions

Chimney
DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.
DO NOT CONNECT TO ANY AIR DISTRIBUTION DUCT OR SYSTEM.
This room heater must be connected to a 6" factory built UL 103 HT chimney or a code-
approved masonry chimney with a flue liner.

Factory Built Chimney

When a metal prefabricated chimney is used, the manufacturer's installation instructions
must be followed. You must also purchase (from the same manufacturer) and install
the ceiling support package or wall pass-through and "T" section package, firestops
(where needed), insulation shield, roof flashing, chimney cap, etc. Maintain proper
clearance to the structure as recommended by the manufacturer. The chimney must be
the required height above the roof or other obstructions for safety and proper draft
operation. See page 8 for chimney termination requirements.
Page 7