Hi-Flame GloFire 905 Panduan Petunjuk Pemasangan dan Pengoperasian - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Petunjuk Pemasangan dan Pengoperasian untuk Pemanas Listrik Hi-Flame GloFire 905. Hi-Flame GloFire 905 16 halaman. Horse flame glofire 905 room heater - installation and operating instructions
Chimney
DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.
DO NOT CONNECT TO ANY AIR DISTRIBUTION DUCT OR SYSTEM.
This room heater must be connected to a 6" factory built UL 103 HT chimney or a code-
approved masonry chimney with a flue liner.
Factory Built Chimney
When a metal prefabricated chimney is used, the manufacturer's installation instructions
must be followed. You must also purchase (from the same manufacturer) and install
the ceiling support package or wall pass-through and "T" section package, firestops
(where needed), insulation shield, roof flashing, chimney cap, etc. Maintain proper
clearance to the structure as recommended by the manufacturer. The chimney must be
the required height above the roof or other obstructions for safety and proper draft
operation. See page 8 for chimney termination requirements.
Page 7