Galvin Engineering CliniMix 100.91.10.20 Installations-Manuale - Seite 2
Blättern Sie online oder laden Sie pdf Installations-Manuale für Temperaturregler Galvin Engineering CliniMix 100.91.10.20 herunter. Galvin Engineering CliniMix 100.91.10.20 4 Seiten. Bs lead safe thermostatic cartridge assembly for cmv2 low flow
Product Installation Guidelines
INSTALLATION
INSTALLATION COMPLIANCE: Galvin Engineering products must be installed in accordance with these
installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements.
Water and/or electrical supply conditions must also comply to the applicable national and/or state standards.
Failing to comply with these provisions shall void the product warranty and may affect the performance of the
product.
1. Close the mains and deinstall Spout
-
Close off both (hot and cold) water
mains or power main. Ensure water is
not flowing when hand waving in front
of the sensor.
-
Loosen grab screw to unlock the
spout. Pull and gently remove the
spout.
Removing the disinfection key cover
-
plug might help with detaching the
faceplate in next steps.
3. Ensure water is closed
Turn the isolating valve to 'CLOSE'
-
position.
© Galvin Engineering Pty Ltd
2. Remove the faceplate
-
Loosen the grub screw shown on above
picture.
-
Unscrew the locking nut and remove.
Remove the flange.
-
Carefully remove the faceplate.
-
Do not change the position of the backnut if
not necessary.
Disconnect sensors' and solenoids' cables
-
connections.
Plastic ring
4. Remove locking ring
-
Break/remove the plastic lock in the centre
of the thermostatic mixing valve.
Version 1, 14 September 2022, Page 2 of 4