2.
By means of a 13 mm key, screw down and remove the
six М8х12 bolts from the left and right side of the
reducer (see: Figure 3).
3.
Place the plough iron bracket on the reducer, while
placing the right section of the bracket between the
reducer and the shield lug and the left section between
the reducer and the guard clamp (see: Figure 4, 5).
Blade
bracket
4. Fit the plough iron bracket holes and the reducer holes
(from which bolts have been removed as per Point 2)
together, then screw in the six М8х12 bolts with washer by
hand. Screw the central bolt in the reducer (from the right),
installing it in the hole of the shield lug (see: Figure 4)
.
Guard
clamp
Note: USE ONLY М8Х12 BOLTS.
Warning!
Do not tighten the six М8х12 bolts when performing Point 4.
4.
By means of a 13-mm key, holding the head of the bolts,
screw off the M8 nuts with bolts of 13mm and remove
the М8х90 bolts from the handlebar bracket.
5.
Insert the handlebar bracket in the plough iron bracket,
and place the bolts removed as per Point 5 in the
relevant holes of the brackets from outside.
6.
Using 13-mm keys, tighten all the bolts installed as per
the previous point, starting with those fastening the
plough iron bracket to the reducer.
М8х12 screw
Figure
3
Shield lug
Figure
4
Plough
iron
bracket
Figure
5
2. Setting the plough iron in operating
position
Tilling depth is defined by the position of the plough iron as
compared to the bracket. There are wheels mounted on the
plough iron for the transportation of the cultivator.
For performing the tillage, set the plough iron with wheel up.
Setting the blade:
Depth of soil tilling is defined by the plough iron (tilling depth
limiter), which can be found in the lower part of the cultivator,
under the handlebar. There are wheels mounted on the
plough iron for the transportation of the cultivator. For soil
tilling, set the plough iron with wheel up (see: Figure 6).
Plough iron set
properly
Pull out the cotter pin (Point 1), remove the retaining pin
(Point 2), then remove the plough iron with wheels (Item
3) from the jointing bracket.
Place the plough iron in the bracket in such a way that
wheels stand upwards (Item 4).
Fit the hole of the bracket together with one hole of the
plough iron (Point 5), fasten it with bolt pin (Item 6) and
cotter pin (Item 7).
For increasing tilling depth, increase the length of plough iron
lower part.
Note: For efficient work performance, make sure that
plough iron is set properly as compared to the jointing
bracket (see: addition to Figure 6).
3.
Assembly and installation of blades
Install the blades on the blade holder (Figure 7) using
М8х25 bolts, 8 washer and М8 nut (Figure 8). This
component is installed on the left side in the direction of
travel. When installing the component, make sure that
cutting edge of blades are set in accordance with the
cultivator's direction of travel. If the component is properly
assembled, then the curve of the blade nearer to the reducer
will show from the reducer to the driver.
The right side element must be assembled in the same way,
in opposite-hand view.
Figure
6
Figur
e 7
5