Maiwe MIEN1203 Benutzerhandbuch - Seite 10

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Schalter Maiwe MIEN1203 herunter. Maiwe MIEN1203 14 Seiten. Industrial ethernet switch

Maiwe MIEN1203 Benutzerhandbuch
MIEN1203/MIEN2205 Industrial Ethernet Switch

3. Hardware installation

3.1. Din-rail installation

For most industrial applications, 35mm standard DIN rail installation is
very convenient. When you take out the device from the packing box, the rear
panel of MIEN1203/MIEN2205/MIE N2205-S/M should have a fixed DIN rail
connector. If the device needs to be clamped on the DIN rail, the installation of
the DIN rail should be checked before installation. It mainly includes the
following 2 items:
Whether the DIN rail is firmly fixed, whether other equipment is installed
on the DIN rail, and whether there is enough space for installing
MIEN1203/MIEN2205/MIEN2205-S/M.
Is there a power supply suitable for MIEN1203/ MIEN2205/
MIEN2205-S/M on the rail?
After selecting the installation location of MIEN1203/ MIEN2205/
MIEN2205-S/M, follow the steps below to install MIEN1203/ MIEN2205/
MIEN2205-S/M on the DIN rail:
Insert the upper part of the card rail into the card slot on the upper part of
the card rail connecting seat. Push down slightly on the upper panel of
MIEN1203/MIEN2205/MIEN2205-S/M and turn the device as shown in Figure
A below.
As shown in Figure B below, insert the DIN rail into the DIN rail
connector to confirm that the MIEN1203/MIEN2205/ MIEN2205-S/M device is
reliably installed on the rail.

3.2. Cable connection

After MIEN1203/ MIEN2205/ MIEN2205-S/M is correctly installed, the
cables can be installed and connected, including the cable connections of the
following interfaces.
Operation interface
- 6 -