Siemens SIPART PS2 Installationsanweisung - Seite 8

Blättern Sie online oder laden Sie pdf Installationsanweisung für Industrielle Ausrüstung Siemens SIPART PS2 herunter. Siemens SIPART PS2 11 Seiten. Mounting bracket kit
Auch für Siemens SIPART PS2: Installationsanweisung (4 seiten), Betriebsanleitung (28 seiten), Installationsanweisung (4 seiten), Hardware-Installationshandbuch (30 seiten), Technische Beschreibung (26 seiten), Kompakt-Bedienungsanleitung (35 seiten), Anleitung zur Installation des Kits (9 seiten)

Siemens SIPART PS2 Installationsanweisung
15900-795
INITIAL PS2 SETUP
Perform the following steps to set the transmission gear ratio switch,
apply instrument air and electrical power, and manipulate the three
setup pushbuttons to initially set up the PS2. Read the cautions on
page 3 before proceeding.
1. Loosen the four captive screws securing the PS2 cover and
remove the cover.
2. Find the specified valve travel and refer to Table 5 for the
transmission gear ratio switch setting: 33 or 90.
3. Refer to Figures 5 and 7 and to the top label on the PS2 to, if
necessary, change the transmission ratio switch position. Use a
small screwdriver to shift the position of the slide switch/bar.
4. Connect tubing from positioner output port, labeled "Y1" on
positioner cover, to actuator inlet.
5. Connect tubing for instrument supply air to positioner supply port
labeled "Pz". Apply air pressure.
!! Do not exceed maximum casing pressure shown on
actuator Warning label.
6. Connect a DC power source to positioner terminals; see Figure 5
for a typical electrical connection label. Electrical connections
vary with positioner model and options. Apply electrical power.
Transmission Gear Switch Settings
FIGURE 5 PS2 Transmission Gear Ratio Switch Location (PS2 Cover Removed)
8
TABLE 5, PS2 Transmission
Gear Ratio Switch Setting
Transmission
Bar
Stroke
Setting
0.71"
33
1.10"
90
1.50"
90
2.28"
90
Use a small
screwdriver to shift
the yellow
transmission gear
switch from 33 to
90.
Shift from 90 to 33
from other side of
PS2.