CRRC MS-BT20 Installationshandbuch - Seite 10

Blättern Sie online oder laden Sie pdf Installationshandbuch für Werkzeuge CRRC MS-BT20 herunter. CRRC MS-BT20 17 Seiten. For 1/2” meishan bobtail

3.4 Sequence of Installation

a. Thread the collar until the pintail is fully exposed.
b. Insert the tool, and make sure the jaws catch onto the proper area of the pintail, as shown
above.
c. Press and hold the trigger to swage the collar.
d. Release the trigger when the collar is fully swaged.

3.5 Typical incorrect operation

Standard correct operation is required to avoid any accidents from occurring.
Please follow the figure below, otherwise, the incorrect operation shown below may
lead to failure of installation, damage to the tool's moving parts, and even personal
injury.
Incorrect operation (Jaws have caught
onto the incorrect area)
Correct operation
8