CRRC MS-BT20 Manual de instalação - Página 10
Procurar online ou descarregar pdf Manual de instalação para Ferramentas CRRC MS-BT20. CRRC MS-BT20 17 páginas. For 1/2” meishan bobtail
3.4 Sequence of Installation
a. Thread the collar until the pintail is fully exposed.
b. Insert the tool, and make sure the jaws catch onto the proper area of the pintail, as shown
above.
c. Press and hold the trigger to swage the collar.
d. Release the trigger when the collar is fully swaged.
3.5 Typical incorrect operation
Standard correct operation is required to avoid any accidents from occurring.
Please follow the figure below, otherwise, the incorrect operation shown below may
lead to failure of installation, damage to the tool's moving parts, and even personal
injury.
Incorrect operation (Jaws have caught
onto the incorrect area)
Correct operation
8