Asgard Gladiator Montageanleitung Handbuch - Seite 2

Blättern Sie online oder laden Sie pdf Montageanleitung Handbuch für Zelt Asgard Gladiator herunter. Asgard Gladiator 7 Seiten.

ASGARD
'GLADIATOR'
PACK CONTENTS
ITEM
PART
QTY
NO
DESCRIPTION
39867
1
1
LH REAR TOP PNL
1150mm*1130mm
39869
2
1
RH REAR TOP PNL
1150*1130
39871
1
3
25
LH FRT TOP PNL
TOP CVR CHNL
1150*1113
39873
4
1
24
RH FRT TOP PNL
TOP FRT-BAK CHNL
1150*1113
39892
5
1
23
SHORT TOP CAP
FLOOR CVR CHNL
744*313
39893
6
1
22
LONG TOP CAP
SIDE CVR CHNL
1486*313
39832
7
1
20
LH BACK PNL
2048*1070
39833
8
1
19
RH BACK PNL
2048*1117
32874
9
1
18
LH REAR SIDE PNL
1828*1107
32875
1
17
10
RH REAR SIDE PNL
1828*1107
39814
11
1
16
LH FRT SIDE PNL
1828*1092
39815
12
RH FRT SIDE PNL
1
15
1828*1092
39831
13
14
REAR BASE PNL
1
FRONT BASE PNL
2196*1106
SELF ASSEMBLY INSTRUCTIONS
2
1
3
40063
2
1080*41
40094
2
1070*40
7
40062
2
1062*38
32916
2
1720*31
32944
1
RH DOOR SA
1740*725
32943
1
LH DOOR SA
9
1740*761
39897
1
ROOF BRACE
938*133
39848
1
FASCIA
1464*292
039861
1
RH FRT PNL
1861*387
ZSCREW100
ZSCREW340 ZSCREW04
39860
1
No10*5/8 S/TAPP
M5*12 CSK ST/ST M5*16 PAN HEAD M7.5*60 ANCHOR BOLT
LH FRT PNL
QTY
320
1861*387
039841
1
2196*1092
4
5
8
10
12
13
14
17
11
20
19
15
ZCOMPPLAS22,23,24
ZSCREW32
2mm,3mm,5mm PACKERS
30
4
8
22
6
23
18
24
16
25
ZCOMPPLAS39
ZCOMPPLAS02
32670
STOPPER
SELF SEAL
25IA GROMMET
BRKT
PLUG
4 + 4 + 4
18
2
8
ASGARD
GLADIATOR
PLEASE NOTE FOR SAFETY REASONS THE
ASSEMBLY OF THIS UNIT REQUIRES
TWO PEOPLE.
BASE INSTRUCTIONS
A FIRM, LEVEL ,FLAT SURFACE IS
REQUIRED AS A BASE FOR THIS UNIT
SUCH AS CONCRETE OR FLAGS.
- MINIMUM BASE MEASUREMENT
FOR GLADIATOR IS 2400W*2635L
TOOLS REQUIRED
- POSI-DRIV SCREWDRIVER
(POWER DRIVER RECOMMENDED)
- 6mm DIA MASONRY DRILL
- 13mm SOCKET SPANNER
(FOR ANCHOR FIXINGS)
- A TUBE OF ALL WEATHER SEALENT
SUITABLE FOR STEEL AND CONCRETE.
DOOR ALLIGNMENT & ANCHORING
OF UNIT
IT IS IMPORTANT TO CORRECTLY LEVEL
THE UNIT USING THE PACKING PIECES
PROVIDED, ONCE ASSEMBLY IN
ACCORDANCE WITH THE INSTRUCTIONS
OVERLEAF IS COMPLETE AND PRIOR TO
FIXING THE UNIT TO THE GROUND.
- SLIDE THE PACKING PIECES UNDER THE
CORNERS OF THE UNITS BASE AS
REQUIRED UNTIL AN EQUAL GAP HAS
BEEN ACHIEVED AROUND THE DOORS
ALLOWING FOR THEIR SMOOTH
OPERATION & ALLIGNMENT.
- DRILL THROUGH THE EIGHT HOLES
IN THE BASE OF THE UNIT USING
6mm DIA MASONRY DRILL TO A DEPTH
OF 70mm.
- SCREW IN THE ANCHOR FIXINGS.
(THESE HAVE A SELF CUTTING THREAD)
IF NOT ANCHORING THE UNIT USE
THE SELF SEAL PLUGS TO BLOCK THE
FIXING HOLES (FIT FROM UNDERSIDE)
PLEASE SEE OUR WEBSITE FOR DETAILS
OF MAINTENANCE OF THIS PRODUCT
WWW.ASGARDSSS.CO.UK