Asgard Gladiator Montageanleitung Handbuch - Seite 4
Blättern Sie online oder laden Sie pdf Montageanleitung Handbuch für Zelt Asgard Gladiator herunter. Asgard Gladiator 7 Seiten.
STEP 9
RUN A BEAD OF SILICONE
SEALENT DOWN THE FULL
LENGTH OF THE LH REAR TOP
VERTICAL JOINT
(RUNNING FRONT- BACK)
PRIOR TO POSITIONING
THE RH REAR TOP AND FRT- BACK
COVER CHANNEL.
HORIZONTAL JOINT
PARTS
INSTRUCTION
LH REAR TOP PNL
PRIOR TO FITTING THE LH REAR TOP PANEL '1' & RH REAR TOP PANEL '2' TOGETHER ALONG WITH THE TOP FRONT TO BACK COVER
- 1
CHANNEL '24' AS SHOWN IT IS IMPORTANT TO RUN A BEAD OF ALL WEATHER SEALENT THE FULL LENGTH OF THE JOINT FROM FRONT
TO BACK.
RH REAR TOP PNL
- 2
FIT SCREWS IN THE VERTICAL JOINT FIRST ENSURING THAT THE FRONT, BACK AND TOP OF THE ROOF SECTIONS FIT FLUSH
TOGETHER ON ALL FACES, IN TIGHTENING THESE SCREWS A SEAL SHOULD BE MADE ALONG THIS JOINT.
TOP FRT- BACK
CVR CHNL
PRIOR TO FITTING THE REMAINING SIX SCREWS IN THE HORIZONTAL JOINT IT IS NECESSARY TO POSITION THE FRT - BACK TOP COVER
- 24
CHANNEL '24' AS SHOWN, THUS HIDING THE POINTS FROM THE PREVIOSLY FITTED SCREWS, THE REMAINING SCREWS HOLD
THE CHANNEL IN PLACE.
12*
STEP 12
2
1
PARTS
INSTRUCTION
ASSEMBLED REAR
POSITION PRE-ASSEMBLED REAR TOP PANELS OVER THE REAR
SIDES AND BACK PANELS AS SHOWN.
ROOF PANELS
1&2
WHEN CORRECTLY POSITIONED THE PANELS SHOULD SLOT
INTO THE CUTOUTS ON SIDES AND BACKS (SEE DETAIL) AND
STOPPER BRKTS
(X8)
FIXING HOLES SHOULD BE ALLIGNED.
SCREW IN POSITION FITTING THE STOPPER BRACKETS AS
INDICATED, THERE ARE TWO BRACKETS TO FIT IN EACH OF
28*
THE SIDE AND BACK PANELS.
2
FRONT TO BACK
1
COVER CHANNEL
- 24
REAR OF TOP PANEL
STEP 13
3
PARTS
INSTRUCTION
PRIOR TO FITTING REMAINING ROOF PANELS IT IS
ASSEMBLED
FRONT
IMPORTANT TO RUN A BEAD FOF SEALENT ALONG
THE FULL LENGTH OF THE CENTRAL JOINT.
ROOF PANELS
3&4
POSITION PRE-ASSEMBLED FRONT TOP PANELS OVER THE REAR
TOP PANELS AND FRONT SIDES AS SHOWN.
STOPPER BRKTS
(X10)
WHEN CORRECTLY POSITIONED THE PANELS SHOULD SLOT
INTO THE CUTOUTS ON SIDES AND FASCIA (SEE DETAIL) AND
56*
FIXING HOLES SHOULD BE ALLIGNED.
SCREW IN POSITION FITTING THE REMAINING STOPPER
BRACKETS
STEP 10 & 11
PARTS
REPEAT STEP 9 WITH LH FRONT TOP PANEL '3'
LH FRT TOP PNL
& RH FRONT ROOF PANEL '4' AND THE REMAINING
- 3
ROOF FRONT TO BACK COVER CHANNEL '24'
RH FRT TOP PNL
- 4
TOP FRT- BACK
CVR CHNL
- 24
12*
STEP 14
SEAL FULL LENGTH
OF THIS JOINT.
4
25
CENTRAL ROOF JOINT
WITH COVER PLATES
IN POSITION
PARTS
INSTRUCTION
POSITION TOP COVER CHANNEL '25' AS SHOWN REMOVE
TOP COVER
SCREWS FROM THE HORIZONTAL FACE OF THE ROOF JOINT
CHANNEL
AS REQUIRED, REFIT SCREWS FIXING THE COVER CHANNEL.
- 25 (X2)
REPEAT WITH REMAINING COVER CHANNEL.
4
ROOF FRT-BACK
COVER CHNL
-24
3
INSTRUCTION
PARTS
SHORT TOP
SHROUD
- 5
LONG TOP
SHROUD
-6
4*
STEP 15
A
25
REMOVE SCREWS
AND REFIT FROM
THIS FACE AS
REQUIRED.
PARTS
ROOF BRACE
- 18
6
5
INSTRUCTION
PRIOR TO JOINING TOP SHROUDS TOGETHER APPLY
A BEAD FO SEALENT ON THE JOINT.
ALLIGN SHORT TOP SHROUD '5' & LONG TOP SHROUD '6'
AS SHOWN SCREW TOGETHER.
A
A
A
18
A
A
REMOVE SIX
CENTRAL
SCREWS 'A'
INSTRUCTION
REMOVE SIX SCREWS 'A' FROM CENTRAL ROOF JOINT.
POSITION ROOF BRACE '18' AS INDICATED AND REFIT
SCREWS.
(NOTE) THIS COMPONENT REQUIRES THE ROOF TO BE
SUPPORTED PRIOR TO FITTING, IT IS DESIGNED TO BE
A TIGHT FIT.