Anchor VMS 25x32 Manual de instrucciones de montaje - Página 7

Navegue en línea o descargue pdf Manual de instrucciones de montaje para Tienda Anchor VMS 25x32. Anchor VMS 25x32 16 páginas. Vehicle maintenance shelter 25' x 32' with extension kits

Anchor VMS 25x32 Manual de instrucciones de montaje
STEP 3 - Add Upper Legs to one Side.
• Lay out the parts as shown. Three (3) upper legs and two (2) purlins.
• The upper leg has angled cuts on one end and square cut on the other.
• The angled/labeled end goes toward the eave weldments.
• Lift the top frame using the eave purlins and insert the upper leg onto the eave weldments. Secure with pin.
• Connect the upper legs together with 2 purlins. This is easiest if the purlin is pinned to the mid leg first before the end
leg is moved into alignment and pinned.
• Pin the four eave covers (2 per end) on each end as shown above.
STEP 4 - Add Upper Legs
to the other Side.
See
Figure 3.
• Assemble as the previous step.
STEP 5 - Add Lower Legs to
Side.
• Lay out the parts. Three (3) lower
legs, three (3) base plates and two
(2) purlins. See Figure 5a.
• The lower leg has a splice inserted
in the square cut end. The splice
goes toward the upper leg.
• The base plates should be
secured in the legs with the appro-
priate hardware. Bolt and eyenuts
on the end legs, eyebolt and eyenut
for the mid leg. See Figure 5b.
See Figure 3.
Eave
purlin
Upper
Leg, left
29
Splice
Eave end
11
weldment.
Eave Cover
Figure 3
Figure 5a
7