Anzzi CRANE SP-AZ059 Manual de instalación - Página 12
Navegue en línea o descargue pdf Manual de instalación para Sanitarios Anzzi CRANE SP-AZ059. Anzzi CRANE SP-AZ059 17 páginas.
INSTALLATION (BATTERY)
Figure 5
Step 5A
The LED Temperature display requires one (1) AA battery inserted into the battery housing
found behind the shower panel.
Step 5B
Once the AA battery is installed the LED Temperature display will activate.
To deactivate the display, remove the AA battery from the housing.
PERFECTION IS OUR TRADITION™
pg. 10