Anzzi CRANE SP-AZ059 Kurulum Kılavuzu - Sayfa 12
Banyo Armatürleri Anzzi CRANE SP-AZ059 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Anzzi CRANE SP-AZ059 17 sayfaları.
INSTALLATION (BATTERY)
Figure 5
Step 5A
The LED Temperature display requires one (1) AA battery inserted into the battery housing
found behind the shower panel.
Step 5B
Once the AA battery is installed the LED Temperature display will activate.
To deactivate the display, remove the AA battery from the housing.
PERFECTION IS OUR TRADITION™
pg. 10