Anzzi CRANE SP-AZ059 설치 매뉴얼 - 페이지 12

{카테고리_이름} Anzzi CRANE SP-AZ059에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anzzi CRANE SP-AZ059 17 페이지.

INSTALLATION (BATTERY)
Figure 5
Step 5A
The LED Temperature display requires one (1) AA battery inserted into the battery housing
found behind the shower panel.
Step 5B
Once the AA battery is installed the LED Temperature display will activate.
To deactivate the display, remove the AA battery from the housing.
PERFECTION IS OUR TRADITION™
pg. 10