Dickinson NEWPORT Manual de instrucciones - Página 12
Navegue en línea o descargue pdf Manual de instrucciones para Calentador Dickinson NEWPORT. Dickinson NEWPORT 19 páginas. Diesel heater
También para Dickinson NEWPORT: Manual de instalación y funcionamiento (10 páginas), Manual de instrucciones de funcionamiento e instalación (16 páginas)
Preliminary Check-List
a)
Remove all plastic coating
b)
Open shut-off valve from gravity feed tank or switch on pressure pump
to allow oil to flow to the oil metering valve
c)
Check all fuel line connections for leaks
d)
Check oil metering valve overflow outlet.
overflow it indicates:-
Tapping the side of the valve may correct the problem.
e)
ASSEMBLE THE BURNER AS DIAGRAM
Superheater
Primary Air
Inlet Holes
(3 Rows)
Primary Air Inlet Holes
(1 Row - pointing down at 45
degrees)
OPERATION
i) Sediment in the valve needle and seat.
ii) Valve float not free.
iii) Excess pump pressure (more than 4 psi.)
6" dickinson AIRFLOWBURNER
Combustion Chamber
Fuel Inlet
If oil drips out of the
9
Burner Ring.
Installed with lip
down
11
Stove Top
Secondary
Air Inlet
Slots
(Obround)