Dickinson NEWPORT Manual de instrucciones - Página 13
Navegue en línea o descargue pdf Manual de instrucciones para Calentador Dickinson NEWPORT. Dickinson NEWPORT 19 páginas. Diesel heater
También para Dickinson NEWPORT: Manual de instalación y funcionamiento (10 páginas), Manual de instrucciones de funcionamiento e instalación (16 páginas)
LIGHTING PROCEDURE
See Page 1 of manual
The first time the oil-metering valve is turned on it will take 5-10 minutes for the fuel lines to
fill and oil to appear in the bottom of the burner.
The burning characteristic of the flame during lighting is as follows :-
Lighting (Primed)
Low Fire (Turn oil valve back on to 1 setting before fire goes out)
THE FLAME MUST BURN ABOVE THE BURNER RING AT ALL TIMES FOR
CAUTION -
CAUTION -
Preheating
The flame colour must be lemon yellow with no smoke
emitted. If the flame does not rise above the burner ring
when the oil metering valve is turned on increase the
setting until it does.
OPERATION TIP
SELECT VALVE SETTING AND, WITH THE COMBUSTION
ASSIST FAN, ADD AS MUCH AIR AS YOU CAN UNTIL
THE FLAME SINKS BELOW THE BURNER RING. THEN
BACK OFF THE FAN SPEED UNTIL THE FLAME IS
OUT OF THE BURNER.
EFFICIENT COMBUSTION
DO NOT LIGHT A HOT BURNER - DO NOT USE GASOLINE OR
OTHER HIGHLY FLAMMABLE MATERIAL TO START THE
BURNER
DO NOT LIGHT A FLOODED BURNER
Fuel Vaporizing
12
Priming Fuel
Burned