Shimano BB-R9100 Manual del Concesionario - Página 18

Navegue en línea o descargue pdf Manual del Concesionario para Accesorios para bicicletas Shimano BB-R9100. Shimano BB-R9100 21 páginas. Front chainwheel
También para Shimano BB-R9100: Manual del Concesionario (21 páginas)

Shimano BB-R9100 Manual del Concesionario
INSTALLATION
Installation of the crank
(C)
(z)
(A)
4
(B)
Push in the stopper plate and check that
the plate pin is securely in place, and
then tighten the screws of the left crank
arm.
Tighten both screws equally to the
specified tightening torque (12 - 14 N·m).
(z)
The illustration is of the left crank
arm (cross-section)
18
(A)
Plate pin
(B)
Stopper plate
(C)
Left crank arm
Tightening torque
12 - 14 N·m
NOTICE
The two screws should be tightened
alternately in stages rather than each screw
being fully tightened at once.
Set the stopper plate in the correct
direction as shown in illustration.